[Q17-Q39] Master 2025 Latest The Questions Oracle Cloud and Pass 1z0-1075-24 Real Exam!

Share

Master 2025 Latest The Questions Oracle Cloud and Pass 1z0-1075-24 Real Exam!

Penetration testers simulate 1z0-1075-24 exam PDF


Oracle 1z0-1075-24 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Setting up Manufacturing Elements: This part of the exam assesses the expertise of manufacturing professionals and focuses on the core functionalities of Functional Setup Manager and Simplified Setup. It includes configuring common elements, resources, operations, and work centers, as well as setting plant parameters and managing security.
Topic 2
  • Manufacturing Costing: This part of the exam is aimed at cost accountants and financial analysts, focusing on the primary features of production costing. It covers evaluating work order completion costs, including partial and scrap costs, and summarizing key aspects of cost reporting, such as the Work in Progress (WIP) Inventory Valuation Report.
Topic 3
  • Managing Work Orders: This portion of the exam evaluates the skills of production and manufacturing managers, emphasizing the functionalities within the Work Execution Work Areas. It includes creating and modifying work orders for both standard and non-standard manufacturing, with serialized production included.
Topic 4
  • Costing and Inventory Foundations: This section is aimed at inventory managers and cost accountants, focusing on common inventory configurations and key aspects of managerial and cost accounting. A solid understanding of these concepts is fundamental for effectively managing inventory and controlling costs within a manufacturing environment.

 

NEW QUESTION # 17
Which option represents all the production exception types that can be reported by a Production Operator in Oracle Manufacturing Cloud?

  • A. Work Area, Work Center, Resources, and Components
  • B. Work Area. Work Center. Resources, Components, and Miscellaneous
  • C. Work Center and Resources
  • D. Resources and Components
  • E. Work Area, Work Center, and Resources

Answer: A

Explanation:
In Oracle Manufacturing Cloud, production operators can report several types of production exceptions that affect the flow of the production process. The complete list of production exception types that can be reported includes:
Work Area: Issues related to the broader production environment.
Work Center: Problems or exceptions that arise at specific work centers.
Resources: Issues with labor, machines, or tools that are part of the production process.
Components: Exceptions related to materials or components used in manufacturing.
Incorrect options:
Options A, B, C, D are incomplete and miss one or more of the exception types available in Oracle Manufacturing Cloud.


NEW QUESTION # 18
A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.
They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.
Which four transactions are required to correct this situation?

  • A. Reverse resources charged to a work order.
  • B. Reverse from Reject to Ready.
  • C. Reverse the product at the last operation.
  • D. Reverse at an operation.
  • E. Reverse from Scrap to Ready.
  • F. Reverse material issued to a work order.

Answer: B,D,E,F

Explanation:
When correcting incorrect move operations such as scrap and reject transactions, and the operations are not count point-enabled and not auto-charged, multiple reverse transactions are required:
Reverse material issued to a work order: This is required to correct any incorrect material that was issued to the work order initially.
Reverse at an operation: This transaction allows the production operator to reverse an incorrect operation move to return the product to the previous step.
Reverse from Scrap to Ready: If the operator incorrectly marked an item as scrap, this transaction moves it back to a ready state for further processing.
Reverse from Reject to Ready: This transaction is used to reverse any items incorrectly marked as rejected back to a ready status.
Incorrect options:
Reverse the product at the last operation (E) and Reverse resources charged to a work order (F) are not necessary since the operations are not count point-enabled and not auto-charged.


NEW QUESTION # 19
Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

  • A. If the e-record is rejected, you can optionally resubmit the rejected electronic records.
  • B. These capabilities are supported for discrete and process work orders.
  • C. Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.
  • D. It generates e-records on initial work order release through UI and sends notifications to approvers.

Answer: C

Explanation:
When implementing Oracle E-Signatures and E-Records for compliance with 21 CFR Part 11 in regulated industries like the pharmaceutical or food industries, certain processes govern how electronic records and signatures are managed for manufacturing work orders. The statement that is not true is:
Statement B is incorrect because when using deferred electronic records and signatures, the work order is not held in a "Released" status until approvals are obtained. Instead, the work order is placed in a "Pending Approval" state until signatures are collected and approval is granted. Only after approval does the work order move to a "Released" status.
Correct statements:
Statement A: E-records are generated at the time of work order release, and notifications are sent to approvers for review.
Statement C: Rejected e-records can be resubmitted for approval if necessary.
Statement D: These capabilities are supported for both discrete and process manufacturing work orders.


NEW QUESTION # 20
Your client informs you that after running the "Process Item Structure Changes to Work Definitions" scheduled process, they received a workflow notification.
Which statement is NOT a workflow notification that you might get if automation is not performed?

  • A. The replacement component has been assigned as an ad hoc Item to the same operation as the original component.
  • B. The original component is not assigned to any work definition operation.
  • C. The original component has been assigned to more than one work definition operation.
  • D. The manufacturing plant Is enabled for ERES, the work definition changes are not expected to go through an approval process.

Answer: D

Explanation:
After running the "Process Item Structure Changes to Work Definitions" scheduled process, a series of workflow notifications may be triggered if the automation is not performed properly. The following notifications can be expected in scenarios where manual intervention is needed:
Statement B is incorrect because, in Oracle Manufacturing Cloud, if the manufacturing plant is enabled for ERES (Engineering Release Execution System), it generally implies that any changes in work definitions would still require an approval process for validation and control. The fact that ERES is enabled would not automatically bypass the approval process.
Correct Notifications:
Statement A: You may receive a notification that a replacement component has been assigned as an ad hoc item to the same operation where the original component was assigned.
Statement C: A notification may alert you that the original component is not assigned to any work definition operation, signaling a potential issue that requires manual intervention.
Statement D: It is also possible to receive a notification indicating that the original component has been assigned to more than one work definition operation, which may require review or adjustment.


NEW QUESTION # 21
Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?

  • A. Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production Monitoring" In Inventory Organization.
  • B. Enable IoT Fleet Monitoring and enable synchronization to IoT Production Monitoring in Plant Parameters.
  • C. Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" in Resources.
  • D. Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production
  • E. Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" In Plant Parameters.

Answer: A

Explanation:
To track Overall Equipment Effectiveness (OEE) in real-time, Oracle Manufacturing Cloud can integrate with IoT solutions. The correct setup involves:
Enabling IoT Production Monitoring and turning on synchronization to IoT Production Monitoring in the Inventory Organization. This allows real-time data from the shop floor to be captured, processed, and used to monitor equipment effectiveness, performance, and availability.
Incorrect options:
IoT Fleet Monitoring (A) and IoT Asset Monitoring (B, D) focus on tracking assets and fleets, which are more relevant for logistics or asset management, not production monitoring for OEE.


NEW QUESTION # 22
During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.
What must they do to achieve this?

  • A. Update work order costs at any time; they can be updated regardless of the status of the work order
  • B. Make sure that all costs are Included while closing last month's work orders; however, variances can be Included after closing the work orders.
  • C. Exclude cost variances while closing last month's work orders because those can be applied directly In Subledger Accounting.
  • D. Include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected must not be closed.

Answer: D

Explanation:
To ensure that work orders for the previous month are closed with the correct costs, the Production Supervisor must:
Include all costs and variances in the work orders before closing them. This ensures that the work orders reflect the true cost of production, including any deviations from the expected costs. However, if there are work orders that are still in progress or expected to receive updates (such as material or labor transactions), those work orders should not be closed until all costs are finalized.
Incorrect options:
A: Excluding cost variances would result in inaccurate costing.
B: All costs, including variances, must be included before closing.
D: Costs cannot be updated after the work order is closed, so all updates must occur before closing the work order.


NEW QUESTION # 23
Your client has asked you to implement the functionality to ensure that the system checks for Qualified Operators when reporting labor usage.
Which statement is NOT true?

  • A. Qualified labor must be reported at the resource train stop.
  • B. Validation of operator qualification is also enforced when reporting operation is completed through the dispatch list.
  • C. You will need to report a qualified operator to manually report resource transactions, if the resource has a job profile associated with It.
  • D. Quick Complete is allowed for operations that contain resources with associated job profiles.

Answer: D

Explanation:
When implementing the functionality for checking Qualified Operators during labor usage reporting in Oracle Manufacturing Cloud, it is important to enforce validation for operator qualifications. The following explains why statement C is not true:
Quick Complete is not allowed for operations that have resources with associated job profiles. This is because operations with specific job profile requirements must go through a more detailed validation process to ensure that the assigned operator has the necessary qualifications before the operation can be completed. Quick Complete bypasses detailed validations, making it unsuitable for operations with strict qualification checks.
Correct statements:
Statement A: Operator qualification is enforced when reporting operation completion through the dispatch list to ensure compliance.
Statement B: A qualified operator is required to manually report resource transactions when the resource has an associated job profile.
Statement D: Labor for qualified operators must be reported at the resource train stop to ensure the resource's qualifications are properly validated before continuing with the operation.


NEW QUESTION # 24
A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

  • A. Review Dispatch List
  • B. Review Production Transaction History
  • C. Report Resource, Material, and Operation Transactions
  • D. Manage Work Orders

Answer: B

Explanation:
To review all the transactions associated with a job, including materials issued, resources charged, and operations performed, the Production Operator should select Review Production Transaction History. This task provides a comprehensive overview of all transaction types, whether for work order or orderless execution, in a single place.
Review Production Transaction History offers a detailed record of all activities performed during a work order or orderless transaction, making it easy for operators to audit and review the work executed in previous shifts.
Incorrect options:
Report Resource, Material, and Operation Transactions (A) is used for recording transactions, not for reviewing historical data.
Manage Work Orders (B) and Review Dispatch List (D) provide more general management and operational details, but not the comprehensive transactional history.


NEW QUESTION # 25
Production operations need operators to execute the right steps to produce quality products, so want to use "View Document Items on a Dispatch List." Which statement is NOT true?

  • A. You will always see the active revision of the attachment from currently effective revision of the document from Master Organization.
  • B. You cannot view the document item attachment on the Manage Supplier Operations page.
  • C. You can add attachments to the document item and invoke the engineering change order to release the latest revision of the document item and attachment.
  • D. You can view the document item attachment in the dispatch list and on the Manage Supplier Operations page by using the attachment icon.

Answer: A

Explanation:
When using the "View Document Items on a Dispatch List" functionality, production operators can view and access necessary document attachments to ensure correct steps in the manufacturing process. The statement that is not true is:
Statement B is incorrect because you do not always see the active revision of the attachment from the currently effective revision in the Master Organization. The revision displayed in the dispatch list may depend on the specific version that was assigned to the work order or operation at the time of creation, not necessarily the most current revision in the Master Organization.
Correct statements:
Statement A: Document attachments cannot be viewed on the Manage Supplier Operations page.
Statement C: Attachments can be added to document items, and updates can be managed through engineering change orders.
Statement D: Document item attachments are viewable both in the dispatch list and on the Manage Supplier Operations page via the attachment icon.


NEW QUESTION # 26
You have been asked to set up cost estimates for 10 different purchased items. Which two tasks can you perform to achieve this?

  • A. Use the Mass Edit functionality.
  • B. Enter cost estimates directly into the UI.
  • C. Run the "Update Item Cost Estimate" ESS process.
  • D. Call a web service.
  • E. Import a spreadsheet.

Answer: B,E

Explanation:
To set up cost estimates for multiple purchased items in Oracle Manufacturing Cloud, the following tasks can be performed:
Import a spreadsheet (A): You can import cost estimates for multiple items at once using a preformatted spreadsheet, which allows for efficient data entry.
Enter cost estimates directly into the UI (E): Cost estimates can also be manually entered directly through the user interface for individual items, providing flexibility when fewer items need to be updated.
Incorrect options:
Calling a web service (B) is not the correct method for setting up cost estimates.
Mass Edit functionality (C) and Update Item Cost Estimate process (D) do not directly apply to entering new cost estimates for purchased items.


NEW QUESTION # 27
Which three statements are true about the main areas of Managerial Accounting?

  • A. Cost method can be defined with granularity down to individual Items.
  • B. Receipt Accounting Is the application that performs accrual accounting for all types of receipts.
  • C. Landed Cost Management gives organizations financial visibility into their extended supply chain costs.
  • D. Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation Is initiated.

Answer: A,B,C

Explanation:
In Oracle Manufacturing Cloud and related financial applications, managerial accounting plays a significant role in tracking and managing costs across supply chain and manufacturing activities. The following is a breakdown of the correct statements:
Statement A: Receipt Accounting is the application that performs accrual accounting for all types of receipts - Receipt Accounting is a crucial module in Oracle Cloud that supports the tracking of costs and performs accruals related to receipts. This includes processes such as procurement receipts, interorganization transfers, and supplier shipments. This allows organizations to recognize and account for the expenses associated with these receipts.
Reference:
Statement B: Landed Cost Management gives organizations financial visibility into their extended supply chain costs - Landed Cost Management is designed to capture additional costs that arise during the transportation, handling, and processing of goods. This includes costs like shipping, insurance, and customs duties. By including these in the overall cost, it provides a more comprehensive view of the actual costs of goods in the supply chain.
Statement D: Cost method can be defined with granularity down to individual items - In Oracle Manufacturing Cloud, costing methods can be assigned not only at the organization level but also at a granular level down to individual items. This provides flexibility in defining different costing strategies for different products depending on their nature, manufacturing process, or market conditions.
Incorrect Statements:
Statement C: Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation is initiated - While Supply Chain Orchestration automates various supply chain processes, it does not select processes based on Subledger Accounting rules. The orchestration system is more focused on managing and coordinating supply chain processes rather than determining accounting rules.


NEW QUESTION # 28
You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.
Which setup task must you perform in the Manage Plant Parameters section to achieve this?

  • A. Set Default Transaction Mode to Entered.
  • B. Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.
  • C. Set Default Transaction Mode to Work Definition.
  • D. Set Default Transaction Mode to AIL

Answer: C

Explanation:
To ensure that Push components are automatically defaulted when reporting material consumption on the Report Material Transaction page, you must configure the system to use the Work Definition as the default source for transactions.
Setting Default Transaction Mode to Work Definition ensures that the system automatically pulls the component list and quantities as defined in the work order or work definition when operators perform material transactions. This setting streamlines the material consumption process for Push supply type components.


NEW QUESTION # 29
Which statement is NOT true about the Reservations tab?

  • A. Reservations are generally created when a Back-to-Back sales order or a Configured Items sales order Is reserved for the work order.
  • B. Manual reservations can be done for a work order in inventory.
  • C. Demand details displayed are: Document Type (such as Sales Order), Customer Number and Name, Document Number, Due Date, and Quantity.
  • D. A work order can be reserved against one or more sales orders.
  • E. You can view the reservation details of a work order as a source of demand, and a sales order as supply.

Answer: E

Explanation:
In Oracle Manufacturing Cloud, the Reservations tab provides detailed information on reservations linked to work orders and sales orders. The following explains why statement E is not true:
Statement E is incorrect: A work order is typically viewed as a source of supply, not demand. Sales orders generate demand, while work orders are created to supply the required products. Therefore, reservation details will show the work order as a source of supply and the sales order as the source of demand.
Correct statements:
Statement A: Demand details such as document type (e.g., Sales Order), customer number, document number, due date, and quantity are displayed.
Statement B: Reservations are often created for Back-to-Back or Configured Items sales orders to ensure the necessary products are reserved in the system for production.
Statement C: A work order can be reserved against one or more sales orders, especially in cases of configurable or customized items.
Statement D: Manual reservations for a work order can be made directly in inventory to allocate the necessary materials for production.


NEW QUESTION # 30
Which three statements are true about executing rework work orders with manual control?

  • A. If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.
  • B. You can cancel the work order after releasing it and after performing any transactions.
  • C. You must manually issue the assembly item to rework a work order, either partial or full quantity.
  • D. You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.
  • E. You cannot cancel the work order after releasing it or after performing any transactions.

Answer: C,D,E

Explanation:
In Oracle Manufacturing Cloud, executing rework work orders with manual control requires certain steps and restrictions to ensure proper tracking of rework activities:
Statement A: You can perform operation completion only after the assembly item has been issued to the work order. The quantity that can be completed is limited to the quantity of the assembly issued.
Statement C: The assembly item must be manually issued to the work order, allowing for flexibility to issue either a partial or full quantity depending on the rework requirements.
Statement D: Once a work order is released and transactions have been performed, it cannot be canceled. This ensures that work orders already in progress are tracked properly.
Incorrect options:
Statement B: This is incorrect because you cannot cancel the work order after performing transactions.
Statement E: This statement is irrelevant in the context of executing rework work orders with manual control.


NEW QUESTION # 31
Your customer has multiple distribution centers and a few manufacturing plants. The plants manufacture different items with some overlap between them. The distribution centers stock parts from all plants.
A Corporate Engineering team is responsible for centrally defining items and catalogs. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants must be allowed to change some attributes locally.
What is the best way to achieve this?

  • A. Set up plants as inventory organizations, and distribution centers and the corporate Engineering organization as item organizations.
  • B. Set up plants and the Corporate Engineering organization as Inventory organizations, and distribution centers as item organizations.
  • C. Set up plants and the Corporate Engineering organization as item organizations, and distribution centers as inventory organizations.
  • D. Set up plants and distribution centers as inventory organizations, and the Corporate Engineering organization as an Item organization.
  • E. Set up plants, distribution centers, and the Corporate Engineering organization as inventory organizations.

Answer: D

Explanation:
In Oracle Cloud, managing items and their attributes across multiple organizations requires careful structuring of inventory and item organizations. The best way to configure this setup given the customer's requirements is as follows:
Plants and Distribution Centers as Inventory Organizations: Inventory organizations are required to manage on-hand quantities, perform transactions, and handle the physical movement of materials. Plants need to be inventory organizations to manage production, and distribution centers need to be inventory organizations to manage stocking and distribution.
Corporate Engineering Organization as an Item Organization: An item organization is responsible for centrally defining item attributes. By setting the Corporate Engineering team as an item organization, you ensure that item definitions are controlled centrally. The team can define standard attributes while allowing inventory organizations (plants and distribution centers) to modify certain attributes at their level based on local needs.
This structure allows for centralized item management with localized flexibility for plants and distribution centers.
Reference:
Incorrect Options:
A: Defining all entities as inventory organizations would not allow centralized control of item attributes.
C, D, E: These setups would either limit the ability to control item attributes centrally or misassign organizations that need to handle physical inventory as item-only organizations.


NEW QUESTION # 32
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

  • A. Descriptive flexfields (OFFs) at any level
  • B. Item structure component attributes referenced from Product Information Management(PIM)
  • C. Attachments at any level
  • D. Operation resources. Including alternate resources
  • E. Work definition header and version attributes

Answer: B

Explanation:
When enabling audit trail functionality to ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), certain actions related to work definitions and standard operations are audited for changes such as creation, update, and deletion. However, not all aspects are tracked in the audit trail.
Item structure component attributes referenced from Product Information Management (PIM) are not included in the audit trail. PIM attributes are managed separately from manufacturing-specific data, and changes to these components are not captured in the standard operations audit trail.
Audited components typically include:
Work definition header and version attributes
Descriptive flexfields (DFFs) at any level
Attachments at any level
Operation resources, including alternate resources


NEW QUESTION # 33
In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

  • A. Supply Chain Orchestration initiates the creation of a purchase order without the work order.
  • B. Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.
  • C. Expenditure Type is sat to the expenditure type associated to the outside processing Item.
  • D. Supply Chain Orchestration initiates the creation of a requisition with the project details.
  • E. Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

Answer: C,D,E

Explanation:
Supply Chain Orchestration (SCO) plays a vital role in managing project-specific work orders, particularly for outside processing. Here's how it enriches supply requests with project details:
Statement B: Expenditure Item Date is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant - In project-specific work orders, Supply Chain Orchestration assigns the need-by date as the Expenditure Item Date. The Expenditure Organization is typically set to the manufacturing plant handling the work order.
Reference:
Statement D: Supply Chain Orchestration initiates the creation of a requisition with the project details - SCO automatically creates a requisition with all relevant project details, such as project number, task, and expenditure information. This ensures that the procurement process is aligned with the project's financial and material requirements.
Statement E: Expenditure Type is set to the expenditure type associated with the outside processing item - In Oracle Cloud, expenditure types must align with the specific processing items. SCO ensures that the correct expenditure type is applied to the work order and subsequent requisitions.
Incorrect Statements:
Statement A: SCO does not initiate the creation of a purchase order without the work order. A work order is essential for processing the outside work, and its absence would disrupt the orchestration process.
Statement C: The Expenditure Item Date is not set to the receipt date but rather to the requested need-by date for proper alignment with project scheduling.


NEW QUESTION # 34
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

  • A. Descriptive flexfields (OFFs) at any level
  • B. Item structure component attributes referenced from Product Information Management(PIM)
  • C. Attachments at any level
  • D. Operation resources. Including alternate resources
  • E. Work definition header and version attributes

Answer: B


NEW QUESTION # 35
Which three are Cost accounting methods'

  • A. Perpetual Average Cost
  • B. Actual Cost, also known as "FIFO"
  • C. Layer Cost, also known as "LIFO"
  • D. Frozen Standard Cost
  • E. Periodic Actual Cost

Answer: A,B,D

Explanation:
Oracle Manufacturing Cloud supports multiple cost accounting methods to help organizations track the cost of their goods and inventory effectively. Below is an explanation of the correct answers:
Statement A: Perpetual Average Cost - This is a commonly used method in Oracle Cloud where the system continuously updates the average cost of an item with each receipt or transaction. This method is useful for organizations that need to track the moving average cost of goods in real-time.
Reference:
Statement C: Frozen Standard Cost - This method involves predefining a standard cost for each item at the beginning of a financial period. The cost remains "frozen" throughout the period, and variances between the actual cost and the standard cost are tracked and analyzed separately.
Statement D: Actual Cost, also known as "FIFO" - The FIFO (First In, First Out) method records costs based on the order in which items are received. It is a type of actual costing where items are valued based on the specific costs of the earliest received inventory. Oracle Cloud supports FIFO as part of its actual costing methods.
Incorrect Statements:
Statement B: Layer Cost, also known as "LIFO" - Oracle Cloud does not natively support LIFO (Last In, First Out) as a cost method due to accounting and regulatory restrictions in various regions. LIFO is generally not used in the system as a standard method.
Statement E: Periodic Actual Cost - While there is a method called Periodic Average Cost, Periodic Actual Cost is not typically listed as a standard costing method in Oracle Cloud.


NEW QUESTION # 36
Which three requirements are fulfilled by nonstandard work orders?

  • A. Repair
  • B. Rework
  • C. Prototype
  • D. Rescheduling

Answer: A,B,C

Explanation:
Nonstandard work orders in Oracle Manufacturing Cloud are used for specialized tasks that do not follow typical production processes. The following are the main requirements fulfilled by nonstandard work orders:
Repair: Nonstandard work orders can be used for maintenance and repair tasks to fix or refurbish defective or damaged items.
Rework: These work orders are also used for rework processes, where a product needs to be reprocessed to meet quality standards or specifications.
Prototype: Nonstandard work orders can handle prototype production, where items are produced in small quantities for testing and development before mass production.
Rescheduling (A) is typically handled by standard work orders in the production schedule rather than through nonstandard work orders.


NEW QUESTION # 37
Which is NOT a required setup task for Manufacturing master data?

  • A. Manage Plant Parameters
  • B. Manage Work Areas
  • C. Manage Work Centers
  • D. Manage Production Resources
  • E. Manage Plant Profiles

Answer: E

Explanation:
In Oracle Manufacturing Cloud, setting up the Manufacturing master data involves a series of required tasks to enable production operations. The following are the key setups:
Manage Production Resources: This setup task is essential for defining resources such as labor, equipment, and tools that are used in the manufacturing process. Resources are vital to the production planning and scheduling functions.
Manage Plant Parameters: This task is required to define how the plant will operate in terms of material handling, scheduling, costing, and other key operational metrics. These parameters control important aspects of how manufacturing will function at the plant level.
Manage Work Centers: Work centers represent the physical or logical locations where manufacturing operations occur. They must be set up for scheduling and executing production activities.
Manage Work Areas: Work areas are required to group related work centers and define operational zones within a plant. This is important for organizing production and ensuring efficient material flow.
Manage Plant Profiles: This task is not required for setting up manufacturing master data. Plant profiles are typically used for broader plant-level settings but are not directly tied to the manufacturing execution setup.


NEW QUESTION # 38
......